An application of fuzzy BWM for risk assessment in offshore oil projects
Digital Document
Collection(s) |
Collection(s)
|
---|---|
Content type |
Content type
|
Resource Type |
Resource Type
|
Genre |
Genre
|
Language |
Language
|
Peer Review Status |
Peer Review Status
Peer Reviewed
|
Persons |
Author (aut): Ketabchi, Reza
Author (aut): Ghaeli, Mohammad R.
|
---|
Abstract |
Abstract
The purpose of this paper is to examine the existing risks for the offshore project and risk weighting using the fuzzy best worst method (FBWM). In offshore oil projects, we face six major risks. Each of these risks is divided into smaller risks leaving us to have a total of 34 risks. Some of these risks are internal and some are external risks. In this method, first, the experts of this field determined the best and the worst type of risk. Then, using the experts’ opinions, the study compared the remaining risks with the two selected risks and the other weights are determined. In our survey, “Technical Risk and Project Execution” is the most important risk factor followed by “Political Risk and Sanctions”, “Market risk”, “Management risk”, “Financial risk and currency fluctuations” and “Environmental risk”. |
---|
Publication Title |
Publication Title
|
---|---|
Publication Number |
Publication Number
Volume 4, Issue 3
|
Physical Description Note |
Physical Description Note
PUBLISHED
|
---|
DOI |
DOI
10.5267/j.jpm.2019.3.001
|
---|---|
ISSN |
ISSN
2371-8366
|
URL | |
---|---|
Rights Statement |
Rights Statement
|
Keywords |
Keywords
Project management
Risk assessment
Offshore oil projects
|
---|---|
Subject Topic |
Cite this
Language |
English
|
---|---|
Name |
An application of fuzzy BWM for risk assessment in offshore oil projects
|
Authored on |
|
MIME type |
application/pdf
|
File size |
316501
|
Media Use |