File
A genetic algorithm-based method for solving multi-mode resource-constrained project scheduling problem in uncertain environment
Digital Document
Collection(s) |
Collection(s)
|
---|---|
Content type |
Content type
|
Resource Type |
Resource Type
|
Genre |
Genre
|
Language |
Language
|
Peer Review Status |
Peer Review Status
Peer Reviewed
|
Persons |
---|
Abstract |
Abstract
Project scheduling models with resource constraints and multi-mode activities aims to create a schedule for carrying out activities considering precedence constraints and available resources in order to minimize the project duration. In the real world, we face uncertainty related to projects, where there are no historical data, hence, we should rely on the experts' judgements to estimate activity durations. For this purpose, in this paper, the 99-simulation method is used to deal with uncertainty. The exact mathematical programming model is presented in this paper and the hybrid algorithm based on Genetic Algorithm is used to solve this type of project scheduling problem which finds the near-optimal solution in a short computational time. Finally, the effectiveness of the proposed model is examined with a numerical example. |
---|
Publication Title |
Publication Title
|
---|---|
Publication Number |
Publication Number
Volume 5, Issue 2
|
Physical Description Note |
Physical Description Note
PUBLISHED
|
---|
DOI |
DOI
10.5267/j.jpm.2020.1.002
|
---|---|
ISSN |
ISSN
2371-8366
|
URL | |
---|---|
Rights Statement |
Rights Statement
|
Use License |
Keywords |
Keywords
MRCPSP
Simulation
Uncertainty
Genetic algorithm
|
---|---|
Subject Topic |
Cite this
Language |
English
|
---|---|
Name |
A genetic algorithm-based method for solving multi-mode resource-constrained project scheduling problem in uncertain environment
|
Authored on |
|
MIME type |
application/pdf
|
File size |
329515
|
Media Use |